PFT G 5 c FU 230V
Operating Manual
Issued: 09.2007
Knauf PFT GmbH & Co. KG
28
Disconnect and empty the mortar hoses.
Empty the mixer pump by folding up the entire pump component.
The machine is now completely empty with the exception of a small residue in the screw
pump. However, the machine must still be started carefully the next day.
Transport
First disconnect the power supply, then all other cable connections.
Remove water supply lines.
If required, unhook mixing tube.
The
PFT G 5 c FU 230
mixer pump consists of several units (mixing tube, motor with
tilt flange, material hopper) that can be transported separately.
When transporting using a crane, all loose parts (compressor) must first be removed.
Observe the ultimate load of the ropes (min. 350 kg).
WARNING!
Make sure all hoses are depressurised before opening the couplings (observe the
mortar pressure gauge indicator).
Maintenance
Clean the compressor’s filter on a weekly basis, depending on operation. If heavily
soiled, the filter should be replaced.
The dirt trap in the pressure reducer should be taken out and cleaned at least once
every two weeks or replaced if necessary.
Inspect the brass screen at the opening to the booster pump daily.
Summary of Contents for G 5 c FU
Page 50: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 50 Circuit diagram...
Page 51: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 51 Circuit diagram...
Page 53: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 53...
Page 55: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 55...