8
grün
2A
1A
5B
4B
1S2
1
2
4
3
HEAT/TMS
PE
L
N
1E5
1
X1
5
X1
2
X1
6
X1
3
X1
7
X1
4
X1
8
X1
9
X1
10
X1
15
X1
16
X1
L
1P6
PE
N
TPG 251
TPG 252
OPTION
M
1~
U
V
PE
1M7
11
13
12
14
17
M
1~
U
V
PE
1E8
L
1G5
PE
N
1G5
POWER SUPPLY
PE
N
L
1X2
PE
POT.-EQUALIZATION
FRAME GROUNDING
OPTION
TURBO HEATER
BACKING PUMP
FAN
BACKING-PUMP AS ROTARY-VANE-PUMP
21
X1
22
X1
A1
A2
1K1
12
21
14
/1.2
/1.2
12
21
14
1K1
/1.4
K
A
1
2
+3
4
FV-PUMP
ws
PM 051 409 -X
gn
bn
ge
Z
MAINS
TURBO
PE
PE
18
OPTION
19
20
A1
A2
PE
1Y8
TVV 001
FORE-VACUUM SAFETY VALVE
Fuse-rating according to type-plate
Bridge relay contacts 11 and 21 and also 14 and 24 (DU=-cable end sleeves)
Connection to Kl.21 and 22 with DUO sleeve 1.5 mm
Fit switch 1S2 in such a way that terminal positions 1A and 4B point upwards.
Connection Involving Rotary Vane Vacuum Pumps
PM 051 408 -S