
7 - 9
Controls
●
First the right and then the left flap clamp is closed.
●
Both main clamps are lowered at the same time.
Number of operations/steps
functions
1
Move main clamps forwards
2
Lower both main clamps
3
Lower folding unit/engage folding slide
4
Close right flap clamp
5
Close left flap clamp
6
Sewing start
●
The right main clamp is lowered after the left main clamp.
Number of operations/steps
functions
1
Move main clamps forwards
2
Lower both main clamps
3
Lower folding unit/engage folding slide
4
Close left flap clamp
5
Close right flap clamp
6
Sewing start
Number of operations/steps
functions
1
Move main clamps forwards
2
Lower left main clamp
3
Lower right main clamp
4
Lower folding unit/engage folding slide
5
Close left flap clamp
6
Close right flap clamp
7
Sewing start
Summary of Contents for 3582-2/01
Page 89: ...Register 08 Contents Chapter Page 13 Pneumatics circuit diagramc 13 1 Circuit diagrams 13 8...
Page 96: ...13 7 Pneumatics circuit diagram Part 6 Version 01 01 2002 a0 A0 14 14 Q2 5 Y14 Q2 6 Option Y15...
Page 98: ...13 9 Version 01 01 2002 Circuit diagrams...
Page 99: ...13 10 General Plan Inputs Version 01 01 2002...
Page 100: ...13 11 Version 01 01 2002 General Plan Inputs Outputs...
Page 101: ...13 12 General Plan Clamp Drive Version 01 01 2002...
Page 102: ...13 13 Version 01 01 2002 General Plan Quick Mini Stop...
Page 103: ...Notes...