
Set-up and Initial Start-up
24
8
.02
Initial start-up
●
Before the initial start-up, clean the machine thoroughly and lubricate or fill the oil, see
chapter 12 Maintenance and Care
!
●
Inspect the machine and in particular the electric lines and pneumatic connecting hoses
for possible damage.
●
Arrange for technical staff to check whether the machine may be operated at the existing
mains voltage and whether it is connected properly.
Do
not
operate the machine if there are any differences!
The machine must only be connected to a grounded socket!
●
Connect the machine to the compressed
air system and push the slide closure
1
upwards.
●
It must have a supply pressure of
6
bar.
Set this value if necessary, see
chap-
ter 12.06 Monitoring / adjusting the air
pressure
.
Fig. 8 - 07
1
Summary of Contents for 3519-5/01
Page 38: ...Sewing 38 Double point darts Fig 10 02 0 320 mm 0 320 mm Insertion mark Insertion mark...
Page 155: ...155 91 191 499 95 Part 7 Version 07 02 12 Circuit Diagram Overview Start 2 Start 1 Air okay...
Page 156: ...156 Circuit Diagram Overview Version 07 02 12 91 191 499 95 Part 8 A12 CAN3...
Page 157: ...157 91 191 499 95 Part 9 BDF P1 Version 07 02 12 Circuit Diagram Overview RS232 interface...