Set-up and Initial Start-up
20
8
Set-up and Initial Start-up
The machine may only be set up and started up by qualified personnel! All of
the relevant safety regulations must always be complied with in this process!
8
.01
Set-up
Suitable electrical and compressed air supply connections must be provided at the erection
site, see
chapter 3 Technical Data
. The erection site must also have a firm and level
subsurface and adequate lighting.
8
.01.01
Aligning the machine
●
Loosen the nuts
1
and turn the feet
2
so that the machine is horizontal.
●
Tighten the nuts
1.
The alignment on the lower frame tubes can be checked with a spirit level.
Fig. 8 - 01
1
2
Summary of Contents for 3519-5/01
Page 38: ...Sewing 38 Double point darts Fig 10 02 0 320 mm 0 320 mm Insertion mark Insertion mark...
Page 155: ...155 91 191 499 95 Part 7 Version 07 02 12 Circuit Diagram Overview Start 2 Start 1 Air okay...
Page 156: ...156 Circuit Diagram Overview Version 07 02 12 91 191 499 95 Part 8 A12 CAN3...
Page 157: ...157 91 191 499 95 Part 9 BDF P1 Version 07 02 12 Circuit Diagram Overview RS232 interface...