
29
RCS Climbing Device and Hydraulics
Assembly Instructions
Part D Operations
D2 Installing the Climbing Device
D2.1 General assembly
Standard arrangement
Two cylinders per climbing unit are in
use.
Position of the hydraulic hoses
– Depending on the position of the
pump, connect the hydraulic hoses
left or right on the climbing device.
– Connect the hydraulic hoses so that
they are not pulled upwards by the
platform during climbing.
Position of the hydraulic pump
with RCS C/CL:
For the climbing procedure place the
hydraulic pump on the intermediate
platform of the stationary climbing unit.
with RCS P:
Place the hydraulic pump for the
climbing procedure on the building
slab.
–
Arrange the hoses so that they are
not caught up or crushed in the
climbing unit or the building during
the climbing procedure.
–
In the area of the platforms which
are to be climbed, ensure that the
hoses remain loop-free.
–
To prevent the quick couplers from
colliding with the platforms or oth-
er parts of the climbing protection
panel when climbing, it is possible
to arrange the couplings vertically
using angle pieces. Contact PERI!
In order to save time, use 2 sets of
hydraulic hoses, hoses should be
laid alternating between the wall and
climbing rails.
Fig. 26: Standard hydraulic diagram
Cylinder 1
Cylinder 3
Cylinder 2
Cylinder 4
Hose 20 m
A1
A2
A1
A2
B1
B2
B1
B2
Climbing Unit 1
Climbing Unit 2
Hydraulic Pump
Hose 20 m
Hose
10 m
Hose 10 m
A1
B1
A2
B2
A1
B1
A2
B2
1 3
2 4