RCS Climbing Device and Hydraulics
Assembly Instructions
Part C Maintenance
Measures before the initial
commissioning
– Check the completeness of the
technical documentation, e.g. hydraulic
plan, equipment list, electrical wiring
diagram, instructions for switch and
motor.
– Site personnel to familiarise them-
selves with the equipment using the
available documentation.
– Compare required type of current
and voltage with that specified on
the type plate.
– Connecting the plug socket is carried
out by qualified personnel. see C2.2.
– Check the rotary field on the rotary
field display, see D3.1. If the control
lamp changes to red, change rotary
field direction with the integrated
phase inverter.
– Check that the oil tank is clean.
– Fill tank with hydraulic oil, see C3.4.
– Check temperature of the electric
motor.
– Check temperature of the hydraulic oil
and, if necessary, bring to operating
temperature, see C3.3.
– Clean bushing and nipples of all
quick-couplers and check for signs
of damage.
– Check all fittings and re-tighten if
necessary.
– Carefully vent the system during initial
commissioning or after intermediate
storage, see D5.2.
C1 Initial Commissioning
Fig. 18: Hydraulic Pump