CL-05.2 Lock Controller
8 INSTALLATION
Observe the instructions given in Section 7.1 during controller installation.
8.1 General instructions
It is recommended to install controller near OD. Controller should be installed at a place
with easy access for proximity card presentation.
Controller should be installed at least 50 cm away from the readers and other controllers.
8.2 Cables
During controller installation, use cables given in Table 3.
Table 3. Cables used during controller installation
№
Connected equipment
Max.
length, m
Type
Min. wire
cross-section,
mm
2
Example
1 Ethernet (IEEE 802.3)
100
Four twisted pair
cables of no less
than 5
th
category
0.2
2 Power
supply
10
3 OD – Lock
10
Twin cable
0.75
PVC isolation
cord (2×0,75
two-colour)
4 RC-button
5 Door
sensor
6
Fire Alarm
device
Additional equipment to
the output
10 Twin
cable
0.2
RAMCRO
SS22AF-T
(2×0,22) or
CQR-2
The following requirements should be considered when laying all the signal cables
(
Ethernet
, RC-button, door sensor and to the lock) and low-voltage power cables:
it is recommended to install controller at least 1 meter apart from any other external
readers and other EMI sources. EMI sources may reduce proximity card reading
distance and be the cause of system operation malfunctions. The sources of
electromagnetic interferences are: readers, AC lines, electric generators, electric
motors, AC relays, thyristor light regulators, PC displays, computer and telephone
signal communication lines;
all signal cables, sensors, OD and low-voltage power cables should be laid at least
50 cm away from the alternating current cables, powerful motor control cables, pumps,
drives, etc.;
all signal cables can cross power cable only at a right angle;
cable growth (except for
Ethernet
cable) is to be performed
with soldering only.
8.3 Installation order
Follow the requirements given in Section 8.1. Controller connection should be carried out
according to the scheme, given on Fig. 3, using the cables, given in Table 3. Follow this
sequence during controller installation:
1. Unpack the box and check carefully controller delivery set according to Section 4. The
equipment should be free of any mechanical damages.
2. Choose controller installation place. Follow the instructions given in Section 8.1 when
choosing the installation place.
11
Summary of Contents for CL-05.2
Page 1: ...Lock Controller CL 05 2 OPERATION MANUAL ...
Page 2: ...Lock Controller CL 05 2 Operation Manual ...
Page 15: ...Operation Manual Figure 3 Controller connection scheme 14 ...
Page 24: ...CL 05 2 Lock Controller Figure 5 Controller connection scheme through PoE splitter 23 ...
Page 40: ......
Page 42: ...www perco com ...