Operation Manual
6 MARKING AND PACKAGING
Controller has a marking label located on the back side of the housing. The location of the
label and other markers can be found on Fig. 1. The label features the following
information about the controller:
trademark and the manufacturer contact details;
product name and model number;
serial
number;
year and month of manufacture;
power supply range;
consumption
current.
Apart from this, the back side of controller housing features labels with the initial:
MAC – address;
IP – address.
Controller is packed in a carton box keeping it safe from the damages during
transportation and storage.
7 SAFETY REQUIREMENTS
7.1 Installation safety
Controller installation and maintenance should be carried out by qualified specialists who
have studied this
Manual
.
Attention!
Controller connection and jumper installation should be carried out with de-
energized equipment and disconnected power supplies.
Cabling should be executed with the general electrical and work safety rules
observance.
Controller installation should be carried out by fault-free instruments only.
Power supply installation safety requirements are provided in power supply operation
Manual.
7.2 Operation safety
Controller operation should be carried out with the general electrical and work safety rules
observance.
Do not use!
Controller when power supply voltage does not comply with the technical
characteristics described in Section 3
”Technical specifications”
.
Controller in operation conditions that do not conform to those given in Section 2
”Operation conditions”
.
Power supply operation safety requirements are provided in power supply operation
Manual.
10
Summary of Contents for CL-05.2
Page 1: ...Lock Controller CL 05 2 OPERATION MANUAL ...
Page 2: ...Lock Controller CL 05 2 Operation Manual ...
Page 15: ...Operation Manual Figure 3 Controller connection scheme 14 ...
Page 24: ...CL 05 2 Lock Controller Figure 5 Controller connection scheme through PoE splitter 23 ...
Page 40: ......
Page 42: ...www perco com ...