
2
017-
05
18
Temperature Multi-Input Device
Installation and Commissioning
1. O-ring
2. Inverted cable shield
3. Insert the cable wires with the inner plastic piece into the counterpart of the cable gland.
4. Tighten the cap nut and the counterpart.
The tightening torques of cap nuts vary depending on the cable type used. Ensure that you
use the cap nuts according to the table "F2D0-TI-Ex8.* Tightening Torques for Cap Nuts and
Counterparts" above.
Fixing the Housing Cover
Before closing the housing cover: Visually inspect the housing for any visible signs of damage
on the cover seal. If damaged, replace the seal with an original seal wear part.
Tightening torque for the screws of the housing cover: 2.5 Nm
3.2.3
Grounding and Shielding
1
2
3-4 mm
Note!
Electromagnetic Compatibility and Grounding
If the shield of the fieldbus data transfer line is grounded for electromagnetic compatibility
reasons, the following guideline must always be observed:
■
FOUNDATION Fieldbus Application Guide "31.35 bit/s Intrinsically Safe Systems"
Note!
Ensure Equipotential Bonding of F2* Metal Housings
Ensure that the metal housing is connected properly to the equipotential bonding.