
Temperature Multi-Input Device
Installation and Commissioning
2
017-
05
17
Connectorizing Cables Using F*D0-TI-Ex8.*.CGB and F*D0-TI-Ex8.*.CGS
Cable Glands
1. Strip the insulation of the cable up to about 120 mm.
2. Loosen the cap nut from the temperature multi-input device.
3. Remove the inner plastic piece and slip it onto the cable: move it far enough over the cable,
so it completely surrounds the cable insulation.
Ensure that no cable insulation protrudes behind the inner plastic piece.
1. Inner plastic piece
2. O-ring
3. Invert the cable shield over the inside plastic piece and shorten it to a length of 3 ... 4 mm
behind the O-ring.
1
2