27830 -12/40-
TY-CNL-D 1.7x3.5
0-M100
O113
Bond
W3(0.07)
TY-CNL-D
1.7x5.0
TY-CNL-D
1.7x4.0
G126
4. FRONT HOUSING BLOCK
[Disassembly Procedures]
4-1. 0-O100
1) TY-CNL-D1.7x3.0 (x2), 0-O100
2) M2 (Bonded)
Fig.59
Fig.60
4-2. Planet Gear Arm assy.
1) TY-CNL-D1.7x4.0 (Upper side)
2) TY-CNL-D1.7x5.0
3) W3 (t=0.07)
Fig.61
4-3. 0-M100
TY-CNL-D1.7x3.5 (x3)
Fig.62
4-4. 0-S300
1) TY-CNL-D1.7x3.5
2) TY-CNL-D1.7x5.5
Fig.63
[Note of Assembly]
When replacing 0-O100, peel off the scratch
protection seal, and then stick O113 (Light seal
tape) on 0-O100 as shown in Fig.60.
After 0-O100 is assembled, carry out the [ADJ.]
and [CONF.] of [Assembly procedure] (p.17).
[Note of Assembly]
Apply G126 to the both worm gears of the
planet gear arm assy and 0-G100.
Tighten two screws while pressing the planet
gear arm assy upward.
[Note of Assembly]
[ADJ.] Temporary adjustment of AF block
[Required equipment] Hexagonal screwdriver 1.5mm
Screw in 3 adjustment screws until they stops, then screw
back two turns.
After the CCD position adjustment with programmed software
is done, Apply screw-lock agent to between the head of
adjustment screws and washers.
If the adjustment of second mirror position is necessary, it
should be done before installing of 0-M100.
[Note of Assembly]
[CONF.] Installation of 0-S300
1. Make sure that 0-A121 should be installed temporarily by section 1-1-5.
2. Set the AF mode SW to AF.S. (Down position)
3. [CONF.] When the mount lock pin is depressed directly until it comes to mount surface,
the AF coupler should not project out of mount surface.
4. [ADJ.] Adjust the position of 0-S300, and apply the screw-lock agent to screw thread.
TY-CNL-D
1.7x3.5
TY-CNL-D
1.7x5.5
SL
0-S300