
9
3. Capacitor check.
a. Make sure the ca pac i tor is
dis
charged. Use extreme
caution as a spark might
occur.
b. Disconnect the ca pac i tor
leads and connect an analog-
type volt-ohmmeter to the
capacitor terminals.
c. Set the meter on the
RX1,000 scale to check the
start ca pac i tor. Set the meter
on the RX10,000 scale to
check the run ca pac i tor.
d.
The meter should
in di cate low ohms when it
is first connected, but as
the ca pac i tor becomes
charged (by the meter), it
will return to a read ing of
infinity (open circuit).
4. Start relay check.
a. Check the coil re sis tance It
should be 3,000 to 15,000
ohms.
b. Install a clamp on amp
meter around the start
wind ing lead.
c. Set the amp meter scale to
at least 2 times the pump
motor full load current.
d. Place the H-O-A switch in
the Hand position to start
the pump.
e. The meter should read
ap prox i mate ly 2 times full
load current during starting.
f. After the motor has started
(within one sec
ond) the
cur rent should drop to a
value much less than full
load cur rent.
5. Motor voltage check:
Typical
Motor Voltage
Component Lead Mode Reading
Main Winding
Black to
Start
Line Voltage
White
Main Winding
Black to
Run
Line Voltage
White
Start Winding
Black to
Start
Line Voltage
Red
Start Winding
Black to
Run
120%
Red
Line Voltage
Duplex Pump Controller
AUX RELAY
/ HORN
ALT
ALTERNATION
HIGH
ALARM
LOW
ALARM
HIGH
FLOAT
LAG
FLOAT
LEAD
FLOAT
OFF
FLOAT
LOW
FLOAT
MUTE
DISABLED
PUMP 1
PUMP 2
PUMP 1
PUMP 2
PUMP 1
PUMP 2
FLOATS OUT OF ORDER
TEMP FAIL
SEAL FAIL
RESET
PUMP 2
PUMP 1
1 - 2
2 - 1