MAINTENANCE INSTRUCTIONS
69
Ta
B
L
N
Ta
Se
Se
A
TA
CR
SE
Fig. 1
6.7 Electrical connections (Option)
Connect the power supply to the terminal board located on the control panel as follows
:
a.
switch off the power supply at the main switch;
b.
remove the front case panel of the boiler.
(see paragraph ‘6.3 Accessing the boiler’);
c.
remove the screws and remove plate A from the control panel (see fig. 1). With the plate removed, proceed with the
following wires connection:
install the outdoor temperature sensor on contacts marked as
Se-Se
on the terminal board
“
B
”;
install the room thermostat or end switch by removing the jumper
Ta-Ta
from the terminal board “
B
” first, and then
connecting the room thermostat or end switch wires (24 DC at these terminals);
d.
When
wires have been connected, place plate “
A
" back to position and then the front case panel.
Key
SE
Outdoor temperature
sensor
TA
Room thermostat OR End
Switch
Fig. 1
24 Volt DC current at Ta-Ta
terminals. Use only non
power stealing thermostat.
Thermostat or End Switch
Summary of Contents for PNCC-32N
Page 8: ...GENERAL INFORMATION 5 ...
Page 9: ...GENERAL INFORMATION 6 ...
Page 10: ...GENERAL INFORMATION 7 ...
Page 11: ...GENERAL INFORMATION 8 ...
Page 14: ...INSTALLATION INSTRUCTIONS 11 2 2 Dimensions ...
Page 15: ...INSTALLATION INSTRUCTIONS 12 2 3 Internal parts of the boiler ...
Page 16: ...INSTALLATION INSTRUCTIONS 13 2 5 Water circuit ...
Page 17: ...INSTALLATION INSTRUCTIONS 14 2 5 Circulation pump head flow graph ...
Page 35: ...INSTALLATION INSTRUCTIONS 32 ...
Page 41: ...INSTALLATION INSTRUCTIONS 38 36 ...
Page 43: ...INSTALLATION INSTRUCTIONS 40 ...
Page 45: ...INSTALLATION INSTRUCTIONS 42 ...
Page 76: ...MAINTENANCE INSTRUCTIONS 73 6 10 Exploded Drawings ...
Page 77: ...MAINTENANCE INSTRUCTIONS 74 ...
Page 78: ...MAINTENANCE INSTRUCTIONS 75 ...
Page 79: ...MAINTENANCE INSTRUCTIONS 76 ...