Arctica 3200xlp switch Installation Guide       Chapter 2 Installation Notice

 

3

 

15 ~ 30°C 

0 ~ 40°C

40 ~ 65%

10 ~ 90% 

 

Table 2

-

3 Environmental Requirements: Temperature and Humidity 

 

Caution! 

 

A sample of ambient temperature and humidity should be taken at 1.5m above the 

floor and 0.4m in front of the switch rack, with no protective panel covering the front and 

rear of the rack. Short term working conditions refer to a maximum of 48 hours of 

continued operation and an annual cumulative total of less than 15 days. Formidable 

operation conditions refers to the ambient temperature and relative humidity value that 

may occur during an air-conditioning system failure, and normal operation conditions 

should be recovered within 5 hours. 

2.1.3.Power Supply 

Before powering on the power supply, please check the power input to ensure 

proper grounding of the power supply system. The input source for the switch should be 

reliable and secure; a voltage adaptor can be used if necessary. The building’s circuit 

protection system should include in the circuit a fuse or circuit-breaker of no greater than 

240 V, 5A. It is recommended to use a UPS for more reliable power supplying. . 

 

Caution! 

1. Improper power supply system grounding, extreme fluctuation of the input source, 

and transients (or spikes) can result in larger error rate, or even hardware damage! 

2. Disconnect power supply cords before servicing! 

2.1.4.Preventing Electrostatic Discharge Damage 

 

Static electric discharges can cause damage to internal circuits, even the entire 

switch. Follow these guidelines for avoiding ESD damage: 

 

Ensure proper earth grounding of the device; 

 

Perform regular cleaning to reduce dust; 

 

Maintain proper temperature and humidity; 

 

Always wear an ESD wrist strap and antistatic uniform when in contact with circuit 
boards. 

2.1.5.Anti-interference 

Summary of Contents for Arctica 3200xlp Series

Page 1: ...Arctica 3200xlp switch Installation Guide Content 1 Arctica 3200xlp Series switch Installation Guide Version 1 1 2017 02 07...

Page 2: ...tal Requirements 1 2 1 1 Dust and Particles 1 2 1 2 Temperature and Humidity 2 2 1 3 Power Supply 3 2 1 4 Preventing Electrostatic Discharge Damage 3 2 1 5 Anti interference 3 2 1 6 Rack Configuration...

Page 3: ...Arctica 3200xlp switch Installation Guide Content 3 3 2 7 AC Power Supply Connection 7 3 2 8 Earthing Cable Connection 8 3 2 9 Checking the Switch 9...

Page 4: ...Gb connecting to 40Gb 10Gb scheme in data center and distripark network with the characteristic of high reliability multiple redundancy high consistency and flexible convergence proportion Arctica 320...

Page 5: ...us policies can be conducted to forward the traffic By implementing ACL policies users can filter the virus packets such as Worm Blaster Worm Sasser and Red Code etc Arctica 3200xlp switch also suppor...

Page 6: ...ovides more help for building the grand IP network Arctica 3200xlp supports LDP function and MPLS VPN it can access the public network and it can be deployed as PE and P 1 2 Description of Hardware 1...

Page 7: ...tor light and system automatic diagnoses LED They are shown below and described in the following table Table 1 2 The explanation of indicator light of front panel Indicator light Front Panel sign Stat...

Page 8: ...onnection or fail to connect Indicator light of QSFP port Green light always on The port is under the connection state of 40G Amber light always on The port is under the connection state of 4x10G Wink...

Page 9: ...3 30AWG 3 0m QSFP to 4Xsfp Cable Amphenol 582410007 30AWG 3 0m QSFP to QSFP Cable Molex 747571051 30AWG 0 5m 747571101 30AWG 1 0m 747571301 30AWG 3 0m 1 5 Power Supply Module 1 5 1 460W Power Module...

Page 10: ...240VAC and the export is 12V 5 There is a fan and a handle for sticking in or pulling out the module on the back of the power supply The power supply module supports the hot plug Caution 460W and 550...

Page 11: ...00xlp Type Attribute Arctica 3200xlp Dimension W H D mm 433 8 44 550 Weight 10 172 kg Fixed Port 32 QSFP ports Management Port 1 RJ 45 serial console port Power Input 100 240VAC 50 60Hz 2 8A 5 6A Syst...

Page 12: ...sunlight perpendicular incidence Keep the switch away from heat sources and strong electromagnetic interference sources The switch must be mounted to a standard 19 rack or placed on a clean level desk...

Page 13: ...r to contract making the fastening screw insecure Furthermore in dry environments static electricity is liable to be produced and cause harm to internal circuits Temperature extremes can cause reduced...

Page 14: ...ut to ensure proper grounding of the power supply system The input source for the switch should be reliable and secure a voltage adaptor can be used if necessary The building s circuit protection syst...

Page 15: ...e stacked closely When mounting devices in an open rack care should be taken to prevent the rack frame from obstructing the switch ventilation openings Be sure to check the positioning of the switch a...

Page 16: ...the tinder near the switch Do not configure the switch alone in a dangerous situation Use standard power sockets which have overload and leakage protection Inspect and maintain the site and the switc...

Page 17: ...inside 3 1 2 Required Tools and Utilities The required tools and utilities are shown below Cross screwdrivers Flat blade screwdriver ESD wrist strap Antistatic uniform Caution Users should prepare th...

Page 18: ...ided Leave enough space around the switch for good air circulation Caution The brackets are used to fix the switch on the rack They can t serve as a bearing Please place a rack shelf under the switch...

Page 19: ...the following approach 1 The golden finger is entad and aim at the power supply rabbet of the machine to insert to the end downwards You can hear the lock sound of click 2 Force the board on the side...

Page 20: ...d and adown and aim at the fan rabbet of the back machine flatly to the end You can hear the lock sound of click 2 Pinch the sheet metal inward and draw the fan module forth when taking out it Caution...

Page 21: ...aracter terminal 3 2 5 QSFP Transceiver Installation Arctica 3200xlp provides 32 QSFP ports The procedure for installing the QSFP transceiver is shown below Step 1 Put on a ESD wrist strap or antistat...

Page 22: ...r bore Remove the protective cap from one end of the fiber cable Keep the fiber end clean and neat Step 2 Attach one end of the fiber cable to the QSFP transceiver and attach the other end to the tran...

Page 23: ...le to QSFP transceiver of Arctica 3200xlp switch 2 Check out the indicator light state of the light port If LINK light is bright it means the link is connection If LINK light puts out it means the lin...

Page 24: ...dicator in the front panel of the switch The corresponding PWR indicator should light Arctica 3200xlp is self adjustable for the input voltage As soon as the input voltage is in the range printed on t...

Page 25: ...ew from accessories put and screw down the fixed nut on the earthing pillar of the switch 3 Connect another side of the earthing cable to the earthing side Caution The unit shall be permanently connec...

Reviews: