33 |
S t r o n a
List of pictures:
Pic. 1.
Construction of HYBRID Mini and HYBRID Mini 35 burners.
6
Pic. 2.
Construction of HYBRID 44 burner.
6
Pic. 3.
The pattern of the burner nameplate
9
Pic. 4.
Positioning of burner and direction of flame.
14
Pic. 5.
Feeder’s construction.
16
Pic. 6.
Feeder’s auger installation.
17
Pic. 7.
Scheme of installation of boiler room
18
Pic. 8.
Installation of HYBRID Mini and HYBRID Mini 35 burners.
19
Pic. 9.
Installation of HYBRID 44 burner in boiler’s door.
20
Pic. 10.
Maintenance of HYBRID Mini and HYBRID Mini 35 burners.
22
Pic. 11.
Correct positioning of furnace in burner HYBRID Mini and HYBRID Mini 35. 23
Pic. 12.
Position of photosensor in HYBRID burners.
26
Pic. 13.
Electrical scheme of HYBRID burners.
29
List of tables:
Table 1.
Quality requirements of pellet fuel.
8
Table 2.
Technical data.
10
Table 3.
Dimensions of burners.
11
Table 4.
Minimum chimney draft.
13
Table 5.
Minimum dimensions of furnace chamber.
14
Table 6.
Exemplary minimum dimensions of rectangular furnace chamber.
14
Table 7.
Exemplary minimum dimensions of cylindrical furnace chamber.
15
Table 8.
Pressure in burning chamber.
15
Table 9.
Specification of the inspection intervals.
24
Table 10
.
The pattern of the first start-up.
30
Table 11
.
The pattern of first inspection report. 31
12. NOTES
Summary of Contents for HYBRID 44
Page 1: ...1 S t r o n a...
Page 2: ......
Page 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...
Page 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...
Page 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...
Page 36: ...34 P a g e NOTES...
Page 37: ...35 S t r o n a NOTES...
Page 38: ...36 P a g e...
Page 39: ...37 S t r o n a...