21 |
S t r o n a
tighten it with a band.
Insert lower part of feeder pipe in fuel hopper, remember that hole for
sucking granulate must be directed upwards.
Fill the hopper with fuel. Approval for fuel should be made available by the seller.
Specification of fuels is shown in Table 1.
Join feeder with burner by electrical wire providing power to feeder and stick plug into
proper socket on the controller. Remember about zeroing wiring for cover of burner, it
can not be damaged and must be tightly screwed to the cover.
In case when oven or boiler does not have its own STB protection, a capillary
thermostat with fastener should be added to the set. A capillary sensor should be installed
permanently in water coat of boiler, together with temperature sensor of boiler
4.
Connecting the controller
Attach the cover of controller by screws on isolated wall of the boiler or on the wall
of the boiler-room. The wire of a multicoupler should be attached to proper socket on the
right side of burner.
ATTENTION!
Feeder should be positioned at angle
no bigger than 45
O
in relation to the floor.
Summary of Contents for HYBRID 44
Page 1: ...1 S t r o n a...
Page 2: ......
Page 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...
Page 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...
Page 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...
Page 36: ...34 P a g e NOTES...
Page 37: ...35 S t r o n a NOTES...
Page 38: ...36 P a g e...
Page 39: ...37 S t r o n a...