20 |
P a g e
Pic. 9 Installation of HYBRID 44 burner in boiler’s door.
2.
Assembling the chimney for pouring fuel
In top part of burner (model HYBRID 44), insert the chimney in vertical position and press
it until it properly fits in the socket.
3.
Assembling the feeder Pic. 5
Attach with joint flexible pouring pipe, long enough to connect with upper part of the
feeder, no less however than 30 cm from vertical pouring axis of burner. Second
part of flexible pipe insert onto vertical pipe of chimney for pouring fuel of burner and
ATTENTION!
When assembling burner in boiler which
does not have outer thermo-isolation in
place of mounting, isolation pad
should be used
to protect burner against
influence of boiler
temperature.
Summary of Contents for HYBRID 44
Page 1: ...1 S t r o n a...
Page 2: ......
Page 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...
Page 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...
Page 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...
Page 36: ...34 P a g e NOTES...
Page 37: ...35 S t r o n a NOTES...
Page 38: ...36 P a g e...
Page 39: ...37 S t r o n a...