18 |
P a g e
4.
BURNER AND FEEDER ASSEMBLY
Pic. 7. Scheme of installation in boiler room.
Burner and feeder are delivered in ready-made state, ready for installing. They are packed
in cardboard boxes, which have to be unpacked with care.
ATTENTION!
Before starting dismantling
or disassembly entire power supply
must be disconnected.
Summary of Contents for HYBRID 44
Page 1: ...1 S t r o n a...
Page 2: ......
Page 32: ...30 P a g e 10 REPORTS 10 1 First start up report Table 10 The pattern of the first start up...
Page 33: ...31 S t r o n a 10 2 Inspection report Table 11 The pattern of first inspection report...
Page 34: ...32 P a g e 11 LIST OF PICTURES AND TABLES...
Page 36: ...34 P a g e NOTES...
Page 37: ...35 S t r o n a NOTES...
Page 38: ...36 P a g e...
Page 39: ...37 S t r o n a...