SPECIFICATIONS OF CONCRETE
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1
.
Concrete must be thickness 100mm minimum and without reinforcing steel bars
,
and must be dried totally before the installation.
2
.
Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3
.
Floors must be level and no cracks.
C
.
POWER SUPPLY
The electrical source must be 2.2Kw minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
1. For Standard Installation: On surface installation
1.1
PX09/PX09A(X400/X400A) On surface installation foundation
(See Fig. 4)
.
Fig. 4
Summary of Contents for PX09
Page 1: ...PX09 PX09A X400 X400A...
Page 21: ...19 IV EXPLODED VIEW MODEL PX09A X400A Fig 37 Optional Turnplate 82...
Page 22: ...20 MODEL PX09 X400 Fig 38...
Page 23: ...21 CYLINDERS Fig 39 Add grease to lubricate regularly Add grease to lubricate regularly...
Page 24: ...22 CONTROL CABINET SPX ELECTRIC POWER UNIT 220V 50HZ 1PH Fig 40 Fig 41...
Page 37: ...35 72215102 06 2013...