3
II
.
INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill
(Φ19, Φ10, Φ4,)
Hammer
Level Bar
English Spanner (12")
Ratchet Spanner With Socket (28
#
)
Wrench Set
(8
#
, 14
#
, 15
#
, 17
#
, 19
#
)
Carpenter’s Chalk
Screw Sets
Tape Measure (7.5m)
Pliers
Lock Wrench
Grease gun
Fig. 3
Summary of Contents for PX09
Page 1: ...PX09 PX09A X400 X400A...
Page 21: ...19 IV EXPLODED VIEW MODEL PX09A X400A Fig 37 Optional Turnplate 82...
Page 22: ...20 MODEL PX09 X400 Fig 38...
Page 23: ...21 CYLINDERS Fig 39 Add grease to lubricate regularly Add grease to lubricate regularly...
Page 24: ...22 CONTROL CABINET SPX ELECTRIC POWER UNIT 220V 50HZ 1PH Fig 40 Fig 41...
Page 37: ...35 72215102 06 2013...