25
V
.
TEST RUN
A.
Fill oil to cylinder
1. Turn on the power, press the button
Up
, and check the rotated direction of the
motor(This is right if lift is upward, otherwise, it is wrong direction of the motor).
Shut off power and exchange the phase connection if the direction is wrong, and
then follow the following procedure of filling oil to cylinders.
2.Fill reservoir with Hydraulic Oil
(Note: In consideration of power unit’s
durability
,
please use Hydraulic Oil 46#).
3.Lower both platforms to the lowest position.
4.Synchronous adjustment
Turn the Two-way valve to oil filling position
(See Fig. 46)
, press the button
Up
and fill
oil into the secondly cylinders till they are full, and then hold down the button
Lock
for
a
while for bleeding air. Repeating this operation until no air is in the hydraulic system.
5.
Turn the Two-way valve to normal working position
(See Fig. 47)
, press the button
Up
to rise the lift, check the both platforms if raise at the same height, if not, do the
synchronous adjustment till the two safety devices can be locked or released at the
same time
.
B. Test run
Check the height limit switch, the hose and fitting connection, and do test run. The lift
must be tested run and checked carefully before in use.
Normal Working Position
Fig. 47
Oil Filling Position
Fig. 46
Summary of Contents for PX09
Page 1: ...PX09 PX09A X400 X400A...
Page 21: ...19 IV EXPLODED VIEW MODEL PX09A X400A Fig 37 Optional Turnplate 82...
Page 22: ...20 MODEL PX09 X400 Fig 38...
Page 23: ...21 CYLINDERS Fig 39 Add grease to lubricate regularly Add grease to lubricate regularly...
Page 24: ...22 CONTROL CABINET SPX ELECTRIC POWER UNIT 220V 50HZ 1PH Fig 40 Fig 41...
Page 37: ...35 72215102 06 2013...