17
2. Install anchor bolts.
2.1 Raise the lift to 1000mm then drill holes to install the anchor bolts
(
See Fig.32
).
2.2 Fix the anchor bolts.
Drilling the hole for the anchor bolt with the rotary hammer drill, type the anchor
bolt into the ground, and then fasten it with ratchet spanner
(See Fig. 33).
Note: The tightening torque for the anchor bolt is 117N.m. Tap anchor
bolts into the anchor hole at least 90mm deep
Using the anchor bolt
to fix the
model
1
0
0
0
m
m
Fig. 32
Drilling
Clearing
Bolting
Tighten
47
Fig. 33
P1
P2
69
Using the anchor
bolt to fix the
control cabinet
70
Anchor bolts for the model
:
Use
19 driller to drill hole
Anchor bolts for the control cabinet
:
Use
10 driller to
drill hole
90
m
m
Summary of Contents for PX09
Page 1: ...PX09 PX09A X400 X400A...
Page 21: ...19 IV EXPLODED VIEW MODEL PX09A X400A Fig 37 Optional Turnplate 82...
Page 22: ...20 MODEL PX09 X400 Fig 38...
Page 23: ...21 CYLINDERS Fig 39 Add grease to lubricate regularly Add grease to lubricate regularly...
Page 24: ...22 CONTROL CABINET SPX ELECTRIC POWER UNIT 220V 50HZ 1PH Fig 40 Fig 41...
Page 37: ...35 72215102 06 2013...