Electrical Guidelines—Export Installations
35
FOR QUALIFIED ELECTRICIAN REFERENCE ONLY!
All installations and connections are to be performed by a qualified, licensed electrician only
and in accordance with the National electric code and all applicable local regulations.
Ensure power is turned off prior to making any electrical connections.
ATTENTION ELECTRICIAN:
Swim Spa Units must be installed with a Residual Current Device, RCD, (not supplied)
Having a rated operating residual current not seceding 30 mA in accordance with all applicable local codes.
Installation of RCD varies among those manufacturers. Follow each manufacturer’s guidelines
to ensure proper operation and protection of swim spa occupants.
IMPORTANT:
10 Gauge (2.59mm) Copper Wire MUST Be Used
Test RCD Monthly and Prior to Each Use.
NEUTRAL
GROUND
LINE
STRAIN RELIEF
Connecting Power to Swim Spa Pack
(QUALIFIED ELECTRICIAN ONLY)
Confirm the circuit being used for swim spa power is RCD protected either
at main panel box or at disconnect.
Verify that power is off to outside disconnect / RCD.
Determine how wire is to enter swim spa cabinet.
Route wire into swim spa cabinet over to spa pack.
Remove spa pack cover.
Install appropriate strain relief into spa pack. (see photo above)
Insert wire through strain relief, removing wire sheath as needed depending on
wire type.
Strip insulation from wire and insert wire into correct terminal on terminal block.
(see photo above)
Replace spa pack cover.
Refer to start up procedure in manual before turning power on.
Summary of Contents for Summit SX15
Page 2: ......
Page 75: ...Operation Systems WAVE Wireless Control option 72...