![background image](http://html2.mh-extra.com/html/patton-electronics/3095/3095_getting-started-manual_4061180050.webp)
3 • Configuring the DACS for operation
Model 3095 mDSL DACS Getting Started Guide
50
Completing the installation
6. There are two LEDs on the DACS 10/100 Ethernet port: a green LED that indicates link status and activ-
ity, and a yellow LED that indicates line speed.
Verify that the green LED is either flashing green (meaning that packets are being received at the Ethernet
port) or solid green (meaning that the link is valid but no packets are being received).
Congratulations! Your DACS is now installed. For more in-depth information about configuring your DACS
settings, refer to the DSL DACS Administrator’s Reference Guide included on your Model 3095 CD-ROM.
Otherwise, refer to Chapter 4, “Operation and shutdown” for information on activating and de-activating
your Model 3095 DACS.
Summary of Contents for 3095
Page 6: ...Contents Model 3095 mDSL DACS Getting Started Guide 6...
Page 12: ...Model 3095 mDSL DACS Getting Started Guide 12...
Page 69: ...69 Appendix A Network Ports RJ 21X connector pin out Chapter contents Introduction 70...
Page 73: ...73 Appendix B WAN Network Module connector pin out Chapter contents Introduction 74...