7 - Excavation anchoring
StradaPAL – Installation manual
18/43
Fill the hole with concrete (B25 quality as a minimum) over a height of
500 mm.
Set in the base box, pushing the anchoring rods into the concrete so that the
top of the base box is at the final ground level.
With the help of a spirit level, level the base box.
Fill the base box with concrete.
View of the base box in place before finishing
Comply with the setting time recommended by the concrete supplier.
Finish the ground (if the ground has a concrete or pavement finish, you need
not wait for the concrete to set).
Screw 4 nuts on the anchoring rods up to the base box.
These 4 nuts, which are used to level the terminal, are called
"lower nuts" in the rest of the procedure.
D8762
Final ground
level
5
0
0
m
m
D8763
Finishing
Lower
nut