background image

 

 

8 - Chemical anchoring on flat ground 

 

StradaPAL – Installation manual 

23/43 

 

 

Quantity 

Description 

Illustration 

F

as

teni

n

g k

it

 for

 

flat

 gr

ou

n

d

 

wi

th

ou

b

as

b

ox

 

M16 nut 

 

M16 washer 

 

M16 threaded rod 

(310 mm) 

 

F

as

te

n

in

g k

it

 for

 fla

gr

ou

n

d

 

wi

th

 b

as

b

ox

 

Pedestal 

 

Anchoring guard 

plate 

 

16 

M16 nut 

 

M16 washer 

 

M16 threaded rod 

(450 mm) 

 

Remov

al

 

p

rot

ect

ion

 

n

u

ts

 

1 or 2 

(optional) 

Removal protection nut(s) 

 

 

 

The removal protection nut (or nuts) is (are) not supplied with the 
excavation fastening kit, but with the terminal. 

 

Summary of Contents for StradaPAL

Page 1: ...Ref 504015710_1 StradaPAL Rapide Transfer and Cashless Installation manual ...

Page 2: ...use of the contents of this document requires the express written permission of Parkeon Parkeon may change data drawings and descriptions of without prior notice Certain characteristics can vary according to customer specifications and do not represent a commitment from Parkeon Parkfolio EPSUM are trademarks belonging to Parkeon Parkeon S A S Parc La Fayette 6 rue Isaac Newton 25075 Besançon Cedex...

Page 3: ... an excavation at minimum height 17 7 5 Anchoring in an excavation at variable height 19 8 Chemical anchoring on flat ground 22 8 1 Recommended ground 22 8 2 Equipment required 22 8 3 Chemical anchoring on flat ground without base box 24 8 4 Chemical anchoring on flat ground with base box 26 9 Recommendations for anchoring protection 28 10 Opening the maintenance door 29 11 Opening the power suppl...

Page 4: ...he protective top and the antenna with or without zone indicator 37 16 Applying the stickers 39 17 Installing the batteries 40 17 1 Installing the mains battery if present 40 17 2 Installing the solar batteries if present 41 18 Putting into service 43 ...

Page 5: ...hile the concrete is setting in order to inform others of the risk of obstruction The marking may be as shown below providing it is in accordance with local regulations CE Marking Europe This product complies with CE marking regulations The applicable directives depend on the radio communication option With a radio communication option GPRS Wi Fi short range device etc The product complies with th...

Page 6: ... with a cut out and switch off the low voltage with the on off button of the main board Make sure that the earth cable is in good condition Follow the instructions relating to the earth connections of product components in order to ensure compliance with EMC immunity and emissions standards The earth conductor that protects the power cable must be green and yellow Minimum section of the incoming m...

Page 7: ... the Pay Display machine other than as described in this document Environment The product complies with the following standards Directive 2011 65 UE of the European Parliament and of the Council of 08 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment Directive 2012 19 UE of the European Parliament and of the Council of 04 July 2012 on Wa...

Page 8: ...terminal These instructions reflect the procedure applicable on the date of publication The data and illustrations in this document are subject to change Please check with your Parkeon contact if your document is still valid The warranty on Parkeon equipment and software is dependent on compliance by the customer with the transport storage installation operation and maintenance conditions set out ...

Page 9: ... original pallets do not put the terminals in the horizontal position do not stack terminals do not stack terminal pallets 3 2 Transport of terminals after they are taken off the transport pallets While moving terminals after they are taken off their transport pallets Parkeon recommends the use of trucks with star wheels in order to make it easier to move the terminal on the site climbing onto pav...

Page 10: ... Description of the terminal 4 1 Overview The terminal comprises four main areas top area devoted to the user interface and maintenance collection compartment power supply compartment Collection module Power supply module Area devoted to users and maintenance Top D9773 ...

Page 11: ...nd weight of the terminal The terminal has the following dimensions The terminal weighs approximately 90 kg without the battery the weight may vary depending on the optional equipment present D9776 379 328 275 D9775 290 475 226 1488 798 752 974 1120 1210 1336 90 or 180 optional 92 5 ...

Page 12: ...12 43 5 Installation chart Opening the maintenance door and the mains door Preparing the installation Anchoring Taking the terminal off the pallet Terminal installation and levelling Installing the protective top and the antenna Installing the batteries ...

Page 13: ...und the terminal to allow use by maintenance agents and motorists 20 cm at the rear and on the sides of the terminal 1 metre in front of the terminal That means that the space stated below must be provided in relation to any obstacles that may be present walls trees etc Dimensions from the centre of the base of the terminal 35 cm Rear 35 cm 35 cm 115 cm ...

Page 14: ...t the centre of the underside of the housing Recommended characteristics of the mains supply cable 60 cm length available outside the anchoring in order to allow connection to the electrical equipment Mains supply cable tube 50 cm diameter Minimum mains supply cable section 2 5 mm AWG 12 Overview of the arrival of the tube at the centre of the housing Terminal base top view 1 50 mm 90 mm 1 mains s...

Page 15: ...s different terminal installation heights base box buried at variable depths For minimum installation height the terminal is installed level with the ground For variable height installation the terminal is raised in relation to the ground The type of installation is to be chosen depending on the type of use access to persons with reduced mobility etc For more details about the various installation...

Page 16: ...otection nuts optional Quantity Description Illustration Excavation fastening kit 1 Pedestal 1 Form 16 M16 nut 4 M16 washer 4 M16 anchoring rod length 500 mm 1 Anchoring guard plate for variable height installation only Removal protection nuts 1 or 2 optional Removal protection nut s The removal protection nut or nuts is are not supplied with the excavation fastening kit but with the terminal ...

Page 17: ...ng 8x M16 nuts so that the ends of the rods are 104 mm away from the fastening brackets The nuts are to be placed 104 mm away from the end of the anchoring rods as instructed for secure installation Mind the positioning direction the front of the base box must be placed according to the direction of the terminal to be installed on it Put in place the form in the base box if used Front of the base ...

Page 18: ...level level the base box Fill the base box with concrete View of the base box in place before finishing Comply with the setting time recommended by the concrete supplier Finish the ground if the ground has a concrete or pavement finish you need not wait for the concrete to set Screw 4 nuts on the anchoring rods up to the base box These 4 nuts which are used to level the terminal are called lower n...

Page 19: ...t is not indispensable The anchoring protection plate is required Install the protection plate in the base box against the front Fix the anchoring rods to the base box using 8x M16 nuts so that the ends of the rods are 104 mm away from the fastening brackets The nuts are to be placed 104 mm away from the end of the anchoring rods as instructed for secure installation Front of the base box Protecti...

Page 20: ...the help of a spirit level level the base box Fill the base box with concrete fill the base box according to its position in the hole and level it Mind the positioning direction the front of the base box must be placed according to the direction of the terminal to be installed on it Check that the holes for letting water out of the base box are not blocked Height 1 Height 2 Height 3 106 59 96 D893...

Page 21: ...e supplier Finish the ground if the ground has a concrete or pavement finish you need not wait for the concrete to set Screw 4 nuts on the anchoring rods up to 12 mm above the base box These 4 nuts which are used to level the terminal are called lower nuts in the rest of the procedure Base box 12 mm D8935 Lower nut ...

Page 22: ...level using a spirit level 8 2 Equipment required Tools required impact drill Ø20 concrete bit at least 300 mm long rifle type brush blow nozzle rule spirit level rubber mallet masking tape chemical anchoring kit not supplied kit for fastening on flat ground with or without base box according to the selected option one or two removal protection nuts optional IMPORTANT The chemical anchoring kit is...

Page 23: ... 8 M16 nut 4 M16 washer 4 M16 threaded rod 310 mm Fastening kit for flat ground with base box 1 Pedestal 1 Anchoring guard plate 16 M16 nut 4 M16 washer 4 M16 threaded rod 450 mm Removal protection nuts 1 or 2 optional Removal protection nut s The removal protection nut or nuts is are not supplied with the excavation fastening kit but with the terminal ...

Page 24: ...s of the drawing below Make sure that the drilled holes are perfectly vertical so that the terminal is correctly installed on the threaded rods After drilling clean the holes with the rifle brush and then the blow nozzle in order to remove dirt Check the drilled holes by inserting the threaded rods in the holes and checking that 60 mm of rod is emerging D4789 192 mm 160 mm D9732 96 mm 96 mm 68 mm ...

Page 25: ...holes so that they emerge over 60 mm Wipe the threaded rods clean of any surplus anchoring resin Using a spirit level check if the rods are vertical if not make them vertical with the rubber mallet Let dry according to the instructions of the chemical anchoring kit When the anchoring has set screw 4x M16 nuts on the threaded rods up to the ground level These 4 nuts which are used to level the term...

Page 26: ...e box against the front Fix the anchoring rods 450 mm long to the base box using 8x M16 nuts so that the ends of the rods are 104 mm away from the fastening brackets The nuts are to be placed 104 mm away from the end of the threaded rods as instructed for secure installation Identify the location of the future centre of the terminal in accordance with the dimensional requirements detailed in the D...

Page 27: ...he base box and inject the anchoring resin in the four holes Install the base box with the rods in the holes and check if it is horizontal using a spirit level Let dry according to the instructions of the chemical anchoring kit When the anchoring has set screw 4 nuts on the threaded rods up to 12 mm above the base box These 4 nuts which are used to level the terminal are called lower nuts in the r...

Page 28: ... StradaPAL Installation manual 28 43 9 Recommendations for anchoring protection To protect anchoring standing by for terminal installation Parkeon recommends the use of anchoring protection placed on the threaded rods Anchoring protection D9288 ...

Page 29: ...d covers to reduce the risk of vandalism Insert the end of the key in the lock opening With the end of the key push the first guard cover to the left 1 then the second one to the right 2 When the lock is accessible insert the key and unlock the door 3 Open the maintenance door Closing Close the door and lock it with the mechanical key Remove the mechanical key from the lock Guard covers Lock detai...

Page 30: ...s door has a locking system at the bottom of the maintenance compartment for secure access To open the mains door Open the maintenance door Unlock the flap that holds the door locking system Lift the door lock If there is a lock unlock the door using the square key After installing the terminal put the door lock back down to lock access to the door D8756 Door locking flap Door lock ...

Page 31: ...Install and secure the terminal as soon as it is taken off the pallet Tools required 16 mm key After opening the power supply door Unscrew the four screws that are used to fasten the terminal to the pallet 16 mm key taking care not to allow the terminal to tip over Take the terminal off the pallet D9734 Screw x4 ...

Page 32: ...velling Check if the terminal is vertical in the front back direction using a spirit level positioned on the rear of the terminal Check if the terminal is vertical in the left right direction using a spirit level placed on a side of the terminal If the terminal is not fully vertical remove the terminal adjust the position with the 4 lower nuts and repeat the installation procedure Fastening After ...

Page 33: ... interface height StradaPAL Installation manual 33 43 14 Final installation diagram and user interface height 14 1 Installation with excavation anchoring at minimum height Installation in excavation at minimum height 1336 mm 1210 mm 752 mm ...

Page 34: ...nterface height StradaPAL Installation manual 34 43 14 2 Installation with excavation anchoring and variable height Installation in excavation with variable height 1377 mm 1436 mm 1473 mm Finished ground 3 Finished ground 2 Finished ground 1 ...

Page 35: ...14 Final installation diagram and user interface height StradaPAL Installation manual 35 43 14 3 Installation with chemical anchoring on flat ground without base box 1336 mm 1210 mm 752 mm ...

Page 36: ...14 Final installation diagram and user interface height StradaPAL Installation manual 36 43 14 4 Installation with chemical anchoring on flat ground with base box 1593 mm 1347 mm 889 mm ...

Page 37: ... through the hole provided in the zone indicator if present Install the protective top on the zone indicator if present by inserting the four threaded rods with a cone of sealing filler in the four holes provided Fasten the four collar nuts from below the zone indicator if present using a 13 mm key Route the cable of the communication antenna through the hole provided on the top of the housing Fit...

Page 38: ... fit a foam gasket around the communication antenna cable if present and the solar panel cable Connecting the communication antenna Route the cable of the communication antenna along the left hand panel of the housing Hold in place with plastic ties Connect the communication antenna to the connector of the modem present in the intelligence module Antenna cable D8815 Gland seal ...

Page 39: ...pplying the stickers StradaPAL Installation manual 39 43 16 Applying the stickers If they have not been applied apply the various stickers on the terminal as illustrated below D4171 D9000 D8999 D4171 D9001 ...

Page 40: ... create electrostatic charge Clean the battery with absorbent cloth moistened with water only If the electrolyte comes accidentally in contact with the eyes wash your eyes immediately with large quantities of water 17 1 Installing the mains battery if present Make sure that the battery is properly charged before you install it Tools required none Open the maintenance door Install the mains battery...

Page 41: ...make it possible to determine if only one of both batteries is discharged Always replace both batteries at the same time by well charged batteries Tools required none Installing the first battery Open the maintenance door Install the first battery on its support Connect the solar battery cable to the first battery minding the polarity Stack the following while connecting both lugs starting from th...

Page 42: ...s to the left hand side Connect the adapter cable of the second solar battery to the second battery cable present in the power supply compartment Put the protective cover in place on the battery routing the cables through the open side at the rear of the cover Battery cover Close the power supply compartment door D9768 Adapter cable Second battery cable D9777 Rear of the cover ...

Page 43: ...18 Putting into service StradaPAL Installation manual 43 43 18 Putting into service Please refer to the StradaPAL maintenance manual for the starting up procedure ...

Reviews: