8 - Chemical anchoring on flat ground
StradaPAL – Installation manual
27/43
Make sure that the drilled holes are vertical in order to allow proper installation.
After drilling, clean the holes with the rifle brush and then the blow nozzle
in order to remove dirt.
Check the drilled holes by putting in place the base box with the rods and
checking that the bottom of the base box rests fully on the ground.
Remove the base box and inject the anchoring resin in the four holes.
Install the base box with the rods in the holes and check if it is horizontal,
using a spirit level.
Let dry according to the instructions of the chemical anchoring kit.
When the anchoring has set, screw 4 nuts on the threaded rods up to 12 mm
above the base box.
These 4 nuts, which are used to level the terminal, are called
"lower nuts" in the rest of the procedure.
D4789
192 mm
1
6
0
m
m
D9732
96 mm
96 mm
6
8
m
m
9
2
m
m
Centre
Important:
position the future
centre of the terminal in
accordance with the
dimensional constraints
Base
box
1
2
m
m
D8935
Lower nut