7 - Excavation anchoring
StradaPAL – Installation manual
20/43
Put in place the form in the base box (if used).
Fill the hole with concrete (B25 quality as a minimum) over a height of 500
mm.
Lower the base box to the required height (see examples below), pushing
the anchoring rods into the concrete.
With the help of a spirit level, level the base box.
Fill the base box with concrete (fill the base box according to its position in
the hole) and level it.
- Mind the positioning direction: the front of the base box must be placed
according to the direction of the terminal to be installed on it.
- Check that the holes for letting water out of the base box are not blocked.
Height 1
Height 2
Height 3
106
59
96
D8932
155
108
D8933
100
202
D8934
100
155
Base
box
Form
D8761
Front of the base
box
Draining holes