4. Maintenance
4-14
February 2001
3160-A2-GB21-90
Troubleshooting
The DSU/CSU is designed to provide you with trouble-free service. However,
Table 4-6, Troubleshooting
, gives you some direction if a problem occurs.
For problems other than those listed in the table, please contact your service
representative.
Table 4-6.
Troubleshooting (1 of 3)
Symptom
Possible Cause
Solutions
No power
1. The power module is not
securely attached.
2. The wall receptacle has no
power.
1. Check the power module
attachment.
2. Check the wall receptacle
power by plugging in some
equipment that is known to be
working.
Power-Up
Self-Test fails
The DSU/CSU has detected an
internal hardware failure.
Contact your service
representative.
Message
LOS at
NET
appears
1. Network cable problem.
2. No signal is being transmitted
at the far-end.
3. Facility problem.
1. Check that the network cable
is securely attached at both
ends.
2. Check the far-end status.
3. Contact your facility provider.
Message
LOS at
DTE
appears
1. DTE Drop/Insert (DSX-1)
cable problem.
2. No signal being transmitted
from the DTE.
1. Check that the DTE
Drop/Insert (DSX-1) cable is
securely attached at both
ends.
2. Check the DTE status.
Message
OOF at
Net
appears
1. Incompatible framing format
between the network and the
DSU/CSU.
2. Network cabling problem.
3. Facility problem.
1. Check that the framing format
for the network interface is
correct.
2. Check that the network cable
is securely attached at both
ends.
3. Contact your facility provider.
Message
OOF at
DTE
appears
1. Incompatible framing format
between the Drop/Insert port
on the customer premises
equipment and the
DSU/CSU.
2. DTE Drop/Insert (DSX-1)
cabling problem.
1. Check that the framing format
for the DTE Drop/Insert
(DSX-1) interface is correct.
2. Check that the DTE
Drop/Insert (DSX-1) cable is
securely attached at both
ends.
Summary of Contents for 3160-A3
Page 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Page 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Page 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Page 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Page 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Page 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Page 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Page 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...