4. Maintenance
4-38
February 2001
3160-A2-GB21-90
Table 4-10. Test Status Message
Message
Description
No Test Active
No tests are currently active.
LLB Test Active
The network interface is in Line loopback.
PLB Test Active
The network interface is in Payload loopback.
DLB Test Active
The DTE Drop/Insert (DSX-1) port is in DTE loopback.
RLB Test Active
The DTE Drop/Insert (DSX-1) port is in Repeater loopback.
DCLB on Port
n
Port
n is in a Data Channel loopback.
DTLB on Port
n
Port
n is in a Data Terminal loopback.
QRSS on Net
A QRSS test pattern is being sent on the network interface.
1–8 Test Active
A 1-in-8 test pattern is being sent on the network interface.
QRSS on Port
n
A QRSS test pattern is being sent to the network on the channels
allocated to port
n.
511 on Port
n
A 511 test pattern is being sent to the network on the channels
allocated to port
n.
Mon QRSS, Net
A QRSS test pattern is being monitored on the network interface.
Mon QRSS, Port
n
A QRSS test pattern is being monitored on the channels
allocated to port
n.
Mon 511, Port
n
A 511 test pattern is being monitored on the channels allocated to
port
n.
DLB Test, Extrn
The DTE Drop/Insert (DSX-1) port is being held in DTE loopback
by the external contact.
Lamp Test Active
The Lamp test is currently active.
Summary of Contents for 3160-A3
Page 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Page 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Page 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Page 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Page 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Page 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Page 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Page 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...