4. Maintenance
3160-A2-GB21-90
February 2001
4-33
Monitoring Test Patterns
Use the Monitor command to monitor a QRSS test pattern over all the channels on
the network interface, or to monitor QRSS or 511 test patterns on the channels
allocated to an individual port.
This command provides the number of errors detected in the test pattern (5 digits,
maximum 99999).
Procedure
To monitor a QRSS or 511 test pattern:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Ptrns.
3. From the Patterns screen, select Mon.
4. From the Patterns Mon screen, press F1 for QRSS or F2 for 511.
5. From the Monitor screen, press the Function key that corresponds to network
or the port for which you want to send a test pattern. Use the scroll keys, if
necessary. (NET does not appear for the 511 pattern.
The Monitor screen appears with the error count. If the maximum of 99999 is
exceeded,
OvrFlw
appears instead of the count. If the receiver loses
synchronization while the monitor is active,
No Sync
appears.
F1
F2
F3
Test:
Rlpbk Lpbk Ptrns
F1
F2
F3
Patterns:
Abort Send Mon
F1
F2
F3
Patterns: Mon
QRSS 511
F1
F2
F3
Monitor:
Name
NET Prt1 Prt2
Summary of Contents for 3160-A3
Page 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Page 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Page 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Page 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Page 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Page 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Page 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Page 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...