Index
IN-6
February 2001
3160-A2-GB21-90
T
T1
line, D
network
connection, D
technical specifications, B-1
Test branch
example of use, 4-19
test commands, 4-19
front panel LED indications, 3-6
lamp test, 4-35
local loopback, 4-22
abort, 4-29
data channel loopback (DCLB), 4-27
data terminal loopback (DTLB), 4-28
DTE loopback (DLB), 4-25
line loopback (LLB), 4-23
payload loopback (PLB), 4-24
repeater loopback (RLB), 4-26
remote loopback, 4-19
test messages, 4-37
test patterns, 4-30
test jacks
functional description, 4-17
physical description, 1-3, 3-1, 3-4
timing.
See clocking
traps, SNMP, 1-3
troubleshooting
device health, 4-3
diagnostic table, 4-14
performance, 4-5
power-up self-test, 2-10, 4-1
TStat (Test Status) branch
example of use, 4-37
U
UAS (Unavailable Seconds) report, 4-9
User Configuration branch
example of use, 3-20, 3-61
option table, C-18
option worksheet, C-43–C-44
user interface, acquiring/releasing, 3-51
V
V.35 interface, D-12
V.54 Loop 2, 4-27, C-4
V.54 Loop 3, 4-28, C-4
W
warmStart trap, 4-12
weight, B-2
worksheets
configuration option, C-42, H-15
X
X.21 interface, D-13
Y
Yellow Alarm condition
ASCII terminal/printer message, 4-11
Device Health and Status message, 4-4
front panel LED indication, 3-6–3-7
Performance Report message, 4-10
troubleshooting, 4-15
Summary of Contents for 3160-A3
Page 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Page 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Page 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Page 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Page 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Page 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Page 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Page 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...