OPERATOR MANUAL
Page 31
Maintenance
6. To reinstall the U-track insert the
two teeth “C” in the rail “D”, and align the U-track. Push back the U-track
until the lever “E” locks the unit in place. Make sure that the pin “B” is inserted in the receptacle “A”.
Note:
If the blotting pad housing assembly (A)
comes away from the U-track, insert the low Mylar
spring in the lateral slots (B) and the pad housing
in the reference pins (C). Gently press down until
the pad housing stops on the top of the U-Track
wall.
B
A
C
Summary of Contents for Vision X
Page 1: ...OPERATOR MANUAL Page 0 General Operator Manual...
Page 2: ...Panini Vision X Operator Manual...
Page 78: ...OPERATOR MANUAL Page 77 Greek 9 WEEE WEEE Panini WEEE 13 2005 WEEE 2002 96 E...
Page 80: ...OPERATOR MANUAL Page 79 Greek 9 3 Vision X...
Page 81: ...OPERATOR MANUAL Page 80 Japanese 9 WEEE EU WEEE 2002 96 EC WEEE Panini 2005 8 13 WEEE EU...
Page 82: ...OPERATOR MANUAL Page 81 Japanese 9 1 9 2...
Page 83: ...OPERATOR MANUAL Page 82 Japanese 9 3...
Page 84: ...OPERATOR MANUAL Page 83 Chinese 9 WEEE EU WEEE Panini WEEE WEEE 2002 96 EC 2005 8 13...