10
Installing Pressure Nodes
General Installation Guidelines
Ensure software installation and required file exports before installing hardware
Be consistent.
•
Match all node installations in appearance to ensure optimum data collection
Be neat.
•
Ensure there are no hard turns or kinks in hoses during routing and installation
•
Ensure each node provides a representative pressure measurement of the surrounding area
•
Clean installation surfaces thoroughly with alcohol wipes and allow area to dry
•
Ensure no tripping or other data center wiring hazards result from Pressure Node installation
•
Adhere to safety regulations
•
Inform customer when relocating nodes to ensure compliance with site safety protocols
Use plenum-rated zip ties and adhesive cable clips as needed.
•
Attach plenum ties such that the locking mechanism is always on the inside
•
Use diagonal cutters to clip plenum tie ends close to its locking mechanism
•
Use cable clips as needed to ensure appropriate air pressure measurements
Installation Process Flow
Figure 1 shows the procedural flow for installing Pressure Nodes.
Figure 1 – Pressure Node Installation Process Flow
PRESSURE NODE INSTALLATION MANUAL