
DIS-14
4. 1) Unscrew the 2 screws and remove the Ballast Fan.
2) Unscrew the 4 screws and remove the Support plate, Ballast mesh.
3) Unscrew the 4 screws, separate the Ballast case 1 and Ballast case 2.
・
Unscrew the each 4 screws and remove the each B/Q-P.C.Board.
2.12. Removal of Power Supply Block (PC-P.C.Board)
1. Remove the Signal Processing Block according to the steps 1 through 3 in the section 2.10. "Removal of
Signal Processing Block".
2. Remove the Ballast Block according to the steps 1 through 3 in the section 2.11. "Removal of Ballast Block".
3. Unscrew the 7 screws and remove the Power Supply Block.
XYN3+F6FJK
XYN3+F30FJK
XYN3+F6FJK
Ballast Fan
Support plate
Ballast mesh
Ballast case 1
Ballast case 2
XYN3+F6FJK
XYN3+F6FJK
B/Q-P.C.Board (Lamp 1)
B/Q-P.C.Board (Lamp 2)
XYC3+FG10FJK
Power Fan
Power Supply Block
Summary of Contents for PT-DZ13KU
Page 6: ...6 2 Specifications 2 1 Specifications The specifications of the projector are as follows...
Page 8: ...8 2 3 Terminal...
Page 9: ......
Page 11: ...INF 2 1 The name of each part 1 1 Projector body Front Rear Si Bottom...
Page 12: ...INF 3 1 2 Control panel 1 3 Connecting terminals...
Page 13: ...INF 4 1 4 Remote control Front Top Si Bottom...
Page 14: ...INF 5 2 Menu Navigation...
Page 15: ...INF 6...
Page 16: ...INF 7...
Page 17: ...INF 8...
Page 35: ...INF 26 5 Select Log SYSTEM and click Get button 6 Log is displayed...