A-3. CHECKING OF REEL GEARS OPERATION
1) Remove the Mechanism Connection C.B.A.
2) Move the mechanism to "PLAY" position by loading
operation. (Refer to <A-2>)
3) Turn the "Rotor Unit" to check movement of reel
gears.
B. CYLINDER UNIT REPLACEMENT
The Cylinder Unit can be replaced easily by the following
method.
1) Remove the Top Panel.
2) Remove the 3 screws of the Cylinder Unit with a
magnetized screw driver through the holes on the
Bottom Plate as shown in Fig. S3.
e
BOTTOM PLATE
000 000
coo
oo
O 000
coo
000 000 000
000 000 000
ooo ooo oooEB
HOLES
Fig. S3
e
1-2
C. CAPSTAN STATOR UNIT ASSEMBLY
When replacing the CAPSTAN STATOR UNIT, the
CENTRE FIXING TOOL (VFK0851) must be used to fix the
centre of CAPSTAN STATOR UNIT.
Method:
1) Place the CAPSTAN STATOR UNIT into position.
2) Loosely tighten the 3 screws.
3) Insert the CENTRE FIXING TOOL (VFK0851) as
shown in Fig. S4.
4) Tighten the 3 screws.
5) Remove the CENTRE FIXING TOOL.
CENTRE FIXING TOOL
(VFK0851)
CAPSTAN STATOR
UNIT
LOWER METAL
UPPER METAL
Fig. S4
•
•
•
•
•
Summary of Contents for NV-HS1000
Page 68: ...Memo ...
Page 136: ... ...
Page 138: ... Panasonic MATSUSHITA ELECTRIC Printed in Japan ...