Page 1-63
REGULAR
MAINTENANCE
1
1-9
Consumable Parts to be Changed Every 3000 to 6000 Hours
1-9-1
Changing the Board Transfer Belts and Rollers (3000 Hours)
It is a requirement to change the board transfer belts and rollers on the center conveyor and right
and left board conveyors regularly.
Operating procedures
1. Removing the board transfer belt
2. Changing the board transfer rollers
3. Installing the board transfer belt
∗
Change all of the board transfer belts and rollers in the same procedures.
1.
Removing the board transfer belt
∗
If it will not be stored as a spare, cut with nippers and remove it.
1.
Press
UNLOCK
+ Transport oper at the
machine adjustment menu.
• The “Transport operation” screen appears.
2.
Press
UNLOCK
+ Holder to origin .
• The support plate (Z plate) descends to the
origin position.
1E4C-E-MMA01-A11-01
To the next page
Tools
2.5 mm hexagon Allen wrench
Required time
30 minutes to 1 hour
Left board conveyor
Right board
conveyor
Board holder
1B4C-432E
Summary of Contents for KXF-1E4C
Page 2: ......
Page 6: ...4 1E4C E MMA00 B01 00 MEMO ...
Page 12: ...10 1E4C E MMA00 A02 01 MEMO ...