4
Installation Manual
Table of Contents
Table of Contents
Part I: Planning for Installation, Assembly, Testing, & Commissioning
Pre-Commissioning Checklist
1. Installing the Battery Enclosure, Battery & Wires
3. PV Module Connection (DC-Coupled)
6. Battery Connection and Charging Requirements
8. Connecting the SmartHub to the Internet
10. SmartHub Techincal Specifications
Part II: Users Guide
13. Operation and Display Panel
60
To Start Up Equipment (Overview)
To Install, Service or Disconnect (Shutdown) Equipment
Part III: References, Maintenance, Cleaning, Troubleshooting, & Warranty
15. Grid and Load Terminals
16. Generator Installation Instructions (Optional)
17. Internet Connectivity Options
20. Replacing and Installing Additional Batteries
22. Grid Support Parameters (UL1741SA)
98