2-22
1. With Tilt and Azimuth adjustment, loosen screw
(G) first and tighten screw (G) after finish
adjustment. And if turn screw (A) and (F) too
much for adjustment, tighten screw (A), (F) and
(G) alternately.
Figure 3-13-1
2. Perform the Height and X-value adjustment under
the screw (G) tighten completely.
3. Be careful the tape damage at T3 Post, when
adjust tilt of A/C Head. (refer to figure 3-13-1)
Figure 3-13-2
4. Confirm the screw (A) does not loosen, before
execute the A/C Head Tilt adjustment. The screw
(A) should be always touch to top of A/C Head.
5. When the height of A/C Head is adjusted by Nut
(B), first the screw (H) should be loosen. And after
height adjustment finished, tighten the screw (H)
lightly.
Figure 3-13-3
6. After finish X value adjustment, hit the portion (L)
lightly and confirm the specification of X-value.
7. Each adjustment of A/C Head should be finished
at the condition of turn the each adjustment screw
tighten direction. And hit the portion (L) lightly for
remove the distortion of A/C Head plate.
Figure 3-13-4
A/C Head
Lift up portion
Press down
portion
A/C Head
A/C Head
(L)
Summary of Contents for AJ-D400
Page 17: ...2 1 1 Name of Tape Transportation ...
Page 103: ...3 27 2 3 SERVO P C Board Type C D Model ...
Page 104: ...Printed in Japan F20009912NMH ...