ITALIANO
ENGLISH
FRANÇAIS
004779194 - 14/03/2023
65
DEUTSCH
ESPAÑOL
• Then group these cables together through the
application of a tie. Push the appliance until
you are sure that the automatic locking system
has engaged. Pay attention to any interference
caused by the cables.
Fig. 27
Open the door and re-position the safety brack-
et (
A
) securing it with the two screws.
A
Fig. 28
• Close the door.
7.2.2 Installation of generator with stand
In the event of installation in structures with
marble cladding or other materials, the insert
has sliding guides to assist with extracting the
equipment for attaching to the fixing surface
and for carrying out inspections and checks on
the mechanical and electrical components.
Make sure that the base can withstand
the weight of the appliance.
Securely fasten the stand to the sup-
port base, to prevent it from tipping
over when the appliance is pulled out.
Securely fasten the appliance to the
stand, to prevent it from tipping over
when it is pulled out.
The stand is optional.
• Once the pallet has been removed (refer to
paragraph: "HANDLING AND TRANSPORT")
proceed as follows:
• Adjust the height of the stove by turning the
bolts (A) on the stand uprights.
• Level the frame by screwing or unscrewing the
gooseneck feet (B).
• The lower edge of the stove must be at least
1 cm above the marble top of the cladding.
• Drill 4 Ø 8 holes for securing of the frame to the
ground. Use the frame itself as a template.
• Secure the feet (B) of the base with sturdy Ø
8 mm steel expansion plugs (C).
> = 1 cm
B
A
C
Fig. 29