OM 564 pag 7 Cap 5
5.4 STABILIZER LIFTING
When the boom is completely leaned and retracted, it is possible to hoist the
stabilizing legs acting a.f. :
This operation is not included in the emergency procedures because the arm has to
be laid down already and the people kept back from the cage; anyway, it may be
necessary to close the stabilizers for loading onto a lorry.
Recovery has to be executed following this path
1.
start the diesel engine
2.
open the cover of Fig. 5.8
3.
screw the knob of the valve marked with EV03 and EV06 of Fig. 5.9
4.
activate the lever of Fig. 5.10 of the hydraulic distributor side “stabilizer” and at
the same time push the centre of the valve of the stabilizers in the cover of the
left side of the machine (from EV11 to EV14 of Fig. 5.11) one by one.
Fig.
5.8
Fig. 5.9
Summary of Contents for RAGNO XTJ 32 / C
Page 65: ...Palazzani Palazzani Industrie spa OM 201 Pag 1 Cap 2...
Page 66: ...Palazzani Palazzani Industrie spa OM 201 Pag 2 Cap 2...
Page 106: ...Palazzani Palazzani Industrie spa OM 401 pag 1 Cap 4...
Page 112: ...Palazzani Palazzani Industrie spa OM 564 pag 6 Cap 5...
Page 114: ...Palazzani Palazzani Industrie spa OM 564 pag 8 Cap 5 Fig 5 10 Fig 5 11...
Page 153: ...Palazzani Palazzani Industrie spa OM 801 pag 1 Capp 8 11...
Page 161: ......
Page 162: ......
Page 167: ......
Page 168: ......
Page 171: ......
Page 174: ......
Page 176: ......
Page 178: ......
Page 182: ......
Page 183: ......
Page 185: ......
Page 187: ......
Page 189: ......
Page 191: ......
Page 193: ......
Page 194: ...VARIANTE CON STABILIZZATORI A BRACCIO FISSO OPZIONALE...
Page 199: ......
Page 201: ......
Page 204: ......