Machine Maintenance Procedures
3-31
Mainboard Removal
0
Prerequisite:
Upper Cover/Keyboard Removal
1.
Disconnect Bluetooth cable from mainboard connector (A).
2.
Disconnect speaker cable from mainboard connector (B).
3.
Disconnect USB FFC cable (C) from mainboard connector. Refer to
USB Module
Removal
4.
Disconnect LAN from mainboard connector (D).
5.
Disconnect microphone cable from mainboard connector (E).
6.
Disconnect LVDS cable from mainboard connector (F).
7.
Disconnect DC-IN cable from mainboard connector (H).
8.
Remove screw (G) from mainboard.
Figure 3-27.
Mainboard Connectors
9.
Lift mainboard at slight angle.
F
B
D
E
H
G
C
A
Summary of Contents for EasyNote LS11HR
Page 1: ...Packard Bell EasyNote LS11HR LS13HR SERVICEGUIDE ...
Page 10: ...x ...
Page 11: ...CHAPTER 1 Hardware Specification ...
Page 14: ...1 4 ...
Page 55: ...CHAPTER 2 System Utilities ...
Page 77: ...CHAPTER 3 Machine Maintenance ...
Page 80: ...3 4 ...
Page 123: ...CHAPTER 4 Troubleshooting ...
Page 149: ...CHAPTER 5 Jumper and Connector Locations ...
Page 156: ...5 8 Jumper and Connector Locations ...
Page 157: ...CHAPTER 6 FRU List ...
Page 158: ...6 2 Exploded Diagrams 6 4 FRU List 6 6 Screw List 6 20 ...
Page 177: ...CHAPTER 7 Model Definition and Configuration ...
Page 178: ...7 2 Packard Bell EasyNote LS11HR LS13HR 7 3 ...
Page 202: ...7 26 Model Definition and Configuration ...
Page 203: ...CHAPTER 8 Test Compatible Components ...
Page 204: ...8 2 Microsoft Windows 7 Environment Test 8 4 ...
Page 214: ...8 12 Test Compatible Components ...
Page 215: ...CHAPTER 9 Online Support Information ...
Page 216: ...9 2 Introduction 9 3 ...
Page 218: ...9 4 Online Support Information ...