Page 56
Kore 7th Manual / kHLab Edition
10.
KH Chart window.
Calibration station setup
Important!
Dosing pumps calibration in channel #1 and #2 should be performed/
checked every 2 to 4 weeks.
8. kHLab Pumps Calibration and Accuracy Check
8.1. Calibration Using the Calibration/Measuring Cylinder
This calibration method has been described in the Kore 7th application:
Manual
Control / Calibration
Tab.
8.2. Calibration With Precise Digital Scale and Stand/Holder