Page 61
Kore 7th Manual / kHLab Edition
8.6. Checking
Waste Water
(Channel #3) Accuracy
1) Place digital scale on the
calibration stand
.
2) Dispose of any water from calibration cylinder (vial) and place the cylinder on the
digital scale.
3) Turn ON the digital scale.
4) Wait a few seconds and then zero-out the digital scale by clicking (
T
)
Tare
button.
Before starting any measurements, the digital scale LCD display must read 0.00g.
5) Make sure that digital scale is showing [
g
] as the weight unit. If not then start
clicking (
M
) button until you see [
g
] gram unit on the display.
6) If the kHLab module test/mixing cylindrical chamber is empty then add aquarium
water sample to the chamber.
7) From the application, under the “
kHLab
” TAB, click
Test #3 – pump #3
will start
adding
60ml
of water from
Channel #3
to the calibration cylinder (vial).
8) Read the result in grams [g] from the digital scale display.
This is the dosed
amount of water in ml by dosing station in channel #3
.
8.7. Starting the Channel #2 Calibration Process (
Reagent
)
Channel #2 is dedicated for the
Reagent
solution. To calibrate the pump #2 in this
channel follow the steps below. Refer to the picture in “Calibration with precise digital scale
and stand/holder” for using the digital scale.
1) Turn ON the digital scale.
2) Wait a few seconds and then zero-out the digital scale by clicking the
T (Tare)
button. Before starting measurements, the digital scale has to display 0.00g on the
LCD screen.
3) Make sure that digital scale is displaying [
g
] as the weight unit. If not then press the
M (Units)
button until you see [
g
] gram unit on the LCD screen.
4) From the Application, under the “
kHLab
” TAB, click the
Calib reagent
button.
The pump will start adding
reagent solution
to the calibration cylinder (vial).