Page 44 of 92 PAC L.P., All Rights Reserved, 2015
R6000S Operation Manual: Rev. G
g. Set backpressure regulator to 5 - 9 psi. (This pressure setpoint is not critical. The flow setting in
the next step is).
h. Adjust flow meter to 1.0.
i.
Readjust backpressure regulator back to the pressure set in step 7E, if necessary.
j.
Set Sample/Cal switch to Sample and Zero/Span switch to Zero.
k. Set Zero/Span switch to Zero.
l.
Monitor flow meter for 1.0. If flow meter does not read 1.0, adjust regulator at cylinder.
m. Set Zero/Span switch to Span.
n. Monitor flow meter for 1.0. If flow meter does not read 1.0, adjust regulator at cylinder.
o. Set Sample /Cal switch to Sample and Zero/Span switch to Zero.
p. Adjust flow meter to 1.0.
q. Set backpressure regulator to the pressure set in step 7g.
NOTE:
The sample/calibration system is now adjusted. When switching between sample and calibration
gases the flow meter and backpressure should maintain the same value.
3.2
Calibrating the Analyzer
NOTE:
Ensure all gas supplies are turned ON and are at the correct flow and pressure settings and that
an adequate calibrating standard is available.
NOTE:
Make sure the instrument has been running for at least thirty (30) minutes after all settings have
been achieved before making any adjustments.
3.2.1
Set Zero
Do not attempt to operate the analyzer until all installation procedures outlined
in the previous sections of this manual have been successfully completed.
Prior to normal operation, following heading, become familiar with the location
and use of all controls, indicators, connections, and accessories. Also,
carefully read all instructions and warning labels prior to operating any portion
of the system.
1. Set sample/calibrate switch to calibrate; set zero/span switch to zero.
2. Verify Sample flow meter at 1.0.
NOTE:
The sample flow meter will allow sample, span and zero gases to flow through when the
appropriate solenoids are switched/activated.
3. After detector output has stabilized for five minutes (shown by a consistent reading on the level meter
or an auxiliary recorder), press the auto zero button.
4. Once the auto zero light goes out, observe that the detector maintains 0.0 on the level meter or 4.0
mA on the current loop for two minutes.
Summary of Contents for R6000S
Page 1: ...R6000S Operation Manual Revision G www paclp com...
Page 4: ...Page 2 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 6: ...Page 4 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 12: ...Page 10 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 44: ...Page 42 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 50: ...Page 48 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 80: ...Page 78 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 81: ...PAGE 79 OF 92 INTERCONNECT DIAGRAM R6000S REF B42175 R3 TP 1 1...
Page 82: ...PAGE 80 OF 92 FLOW DIAGRAM INTERCONNECT DET FURNACE REF B42134 R1 TP 1 1...
Page 86: ...MK DA QM SR PAGE 84 OF 92 ASSY SULFUR DETECTOR W COOLER REF B42025 N TP 1 1...
Page 87: ...LL DGA QM SR PAGE 85 OF 92 WIRING DIAGRAM SULFUR DETECTOR 110 120VAC REF B42146 F TP 1 1...
Page 88: ...LL QM JK PAGE 86 OF 92 WIRING DIAGRAM SULFUR DETECTOR 220 230VAC REF B42145 E TP 1 1...
Page 91: ...PDalbello JBE PAGE 89 OF 92 COMPONENT IDENT REAR PANEL FURNACE SECTION REF B42162 R3 TP 1 1...
Page 92: ...PAGE 90 OF 92 FLOW DIAGRAM FURNACE SECTION WITH OPTIONAL FURNACE BYPASS REF B42163 R1 TP 1 1...
Page 94: ...PDalbello JBE PAGE 92 OF 92 WIRING DIAGRAM FURNACE SECTION 220 230VAC REF B42144 R3 TP 1 1...