R6000S Operation Manual: Rev. G
PAC L.P., All Rights Reserved, 2015
Page 55 of 92
2. Use the Sulfur Detector Removal and Replacement procedure to remove the sulfur detector.
3. Remove the reaction chamber assembly from the front side of the PMT housing by twisting the
reaction chamber assembly approximately 30º counterclockwise.
4. Carefully extract the fluorescence chamber assembly from the housing, noting its orientation.
NOTE:
At this point the fluorescence chamber can be repaired or replaced with a good assembly.
5. Install the new or repaired fluorescence chamber assembly into the PMT housing.
6. Install the sulfur detector module into the instrument.
7. Replace all connectors, cables, interconnecting wiring, and interconnecting tubing.
8. Perform the start-up procedure to confirm proper operation of the new or repaired reaction chamber
assembly.
9. Recalibrate the instrument.
10. Resume normal operation.
4.2.5
UV Lamp Nulling Procedure
In the event that the UV Lamp has been serviced or moved, the following steps should be taken.
1. Turn the Power switch to the ON position. Remove the top cover of the detector module.
ELECTROCUTION HAZARD!
DEATH OR SERIOUS INJURY WILL OCCUR IF NOT AVOIDED!
An electrocution hazard exists because severe electrical shock hazards exist
when working around the high-voltage and/or 115/230 VAC components while
power is applied.
HOW TO PROCEED: Avoid hazard by turning off the unit with the ON/OFF
switch and remove the power connection or power cord from the unit to the
power source. Also, follow any required lock-out/tag-out procedures your
company policy requires.
To prevent electrical shock hazard DO NOT operate this equipment in rain or
wet conditions.
Ensure that all interconnections are properly installed. Improper connections may cause damage to system
components.
Summary of Contents for R6000S
Page 1: ...R6000S Operation Manual Revision G www paclp com...
Page 4: ...Page 2 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 6: ...Page 4 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 12: ...Page 10 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 44: ...Page 42 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 50: ...Page 48 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 80: ...Page 78 of 92 PAC L P All Rights Reserved 2015 R6000S Operation Manual Rev G LEFT BLANK...
Page 81: ...PAGE 79 OF 92 INTERCONNECT DIAGRAM R6000S REF B42175 R3 TP 1 1...
Page 82: ...PAGE 80 OF 92 FLOW DIAGRAM INTERCONNECT DET FURNACE REF B42134 R1 TP 1 1...
Page 86: ...MK DA QM SR PAGE 84 OF 92 ASSY SULFUR DETECTOR W COOLER REF B42025 N TP 1 1...
Page 87: ...LL DGA QM SR PAGE 85 OF 92 WIRING DIAGRAM SULFUR DETECTOR 110 120VAC REF B42146 F TP 1 1...
Page 88: ...LL QM JK PAGE 86 OF 92 WIRING DIAGRAM SULFUR DETECTOR 220 230VAC REF B42145 E TP 1 1...
Page 91: ...PDalbello JBE PAGE 89 OF 92 COMPONENT IDENT REAR PANEL FURNACE SECTION REF B42162 R3 TP 1 1...
Page 92: ...PAGE 90 OF 92 FLOW DIAGRAM FURNACE SECTION WITH OPTIONAL FURNACE BYPASS REF B42163 R1 TP 1 1...
Page 94: ...PDalbello JBE PAGE 92 OF 92 WIRING DIAGRAM FURNACE SECTION 220 230VAC REF B42144 R3 TP 1 1...