SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
31215054
2-5
Pre-Start Inspection
The Pre-Start Inspection should include each of the following:
1. Cleanliness –
Check all surfaces for leakage (oil, fuel, or bat
-
tery fluid) or foreign objects. Report any leakage to the
proper maintenance personnel.
2. Structure
- Inspect the machine structure for dents, dam
-
age, weld or parent metal cracks or other discrepancies.
3. Decals and Placards
– Check all for cleanliness and legibil
-
ity. Make sure none of the decals and placards are missing.
Make sure all illegible decals and placards are cleaned or
replaced.
4. Operation and Safety Manuals
– Make sure a copy of the
Operation and Safety Manual, AEM Safety Manual (ANSI
markets only), and ANSI Manual of Responsibilities (ANSI
markets only) is enclosed in the weather resistant storage
container.
5. Walk-Around Inspection
– Perform as instructed.
6. Battery –
Charge as required.
7. Fuel
(Combustion Engine Powered Machines)
– Add the
proper fuel as necessary.
8. Engine Oil Supply
- Ensure the engine oil level is at the Full
mark on the dipstick and the filler cap is secure.
9. Hydraulic Oil
– Check the hydraulic oil level. Ensure hydrau
-
lic oil is added as required.
10. Accessories/Attachments
- Refer to the Accessories section
in this manual or the accessory installed upon the machine
for specific inspection, operation, and maintenance instruc
-
tions.
11. Function Check
– Once the Walk-Around Inspection is com
-
plete, perform a functional check of all systems in an area
free of overhead and ground level obstructions. Refer to Sec
-
tion 4 for more specific operating instructions.
12. Boom Control System Check -
Perform a check of the
boom control system as specified in this section.
Parent Metal Crack
Weld Crack
Summary of Contents for JLG 1200SJP
Page 10: ...iv 31215054 TABLE OF CONTENTS...
Page 12: ...vi 31215054 LIST OF TABLES...
Page 14: ...viii 31215054 LIST OF FIGURES...
Page 62: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 31215054...
Page 110: ...SECTION 5 EMERGENCY PROCEDURES 5 4 31215054...
Page 132: ...SECTION 6 ACCESSORIES 6 22 31215054...
Page 164: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 7 32 31215054...
Page 167: ......