Operations sequence
General instructions
cpg
.0: GIS medium-voltage switchgear,
gas insulated, up to 40.5 kV,
in accordance with IEC Standard
Cable test
Once the earthing switch is closed and the cable
compartment cover removed, proceed as follows:
1.
With a flat screwdriver, or similar tool, push through
the "cable compartment cover open" interlock
slot, releasing this interlock and the circuit-breaker
operating pushbuttons.
Figure 7.47.
Operation pushbuttons release process
2.
Press the "0" pushbutton to disconnect the circuit-
breaker.
3.
Open the earthing switch. For safety reasons, it is
advisable to padlock access to the feeder disconnector
operation.
4.
Press the "I" pushbutton to connect the circuit-breaker.
Return the cubicle to its initial condition by proceeding in
reverse order:
1.
Press the "0" pushbutton to disconnect the circuit-
breaker.
2.
Close the earthing switch.
3.
Press the "I" pushbutton to connect the circuit-breaker.
4.
Lift the cable compartment cover interlock with a
flat screwdriver or similar, and position the cable
compartment cover.
Figure 7.48.
Operation pushbuttons
interlocking process
5.
Press the "0" pushbutton to disconnect the circuit-
breaker.
6.
Open the earthing switch.
7.
Close the feeder disconnector.
8.
Press the "I" pushbutton to connect the circuit-breaker.