background image

Fine Tune the VLAN Setup

 Port-and-Protocol Based Support     : Enabled
 Default Priority                    : 0
 Dot1x Protocol Tunnel Status        : Peer
 LACP Protocol Tunnel Status         : Peer
 Spanning Tree Tunnel Status         : Peer
 GVRP Protocol Tunnel Status         : Peer
 GMRP Protocol Tunnel Status         : Peer
 IGMP Protocol Tunnel Status         : Peer
 Filtering Utility Criteria          : Default
 Port Protected Status               : Disabled

Configuring In-Band Management

Typically, you can access the Oracle ILOM interface within the switch through the NET MGT

port. By configuring in-band management, the Oracle ILOM interface becomes accessible

through one of the 24 10 GbE ports. The NET MGT port remains active, and simultaneous

access to Oracle ILOM is possible.

“Requirements for Configuring In-Band Management” on page 23

“Configure In-Band Management” on page 24

Requirements for Configuring In-Band Management

These requirements must be met to configure in-band management:

In-band and NET MGT networks must be in different subnets.

Configure DHCP on only one of the interfaces. Otherwise, the switch receives two default

routes.

Configure one IP gateway only. You can configure the IP gateway using either network

management or in-band settings. The IP gateway setting of the other gateway must be set to

0.0.0.0

.

Note - 

If the IP gateway is changed to another subnet, the current 

ssh

 session stops

responding.

On the in-band network, ports used to connect to the switch must be in the default VLAN.

No other configuration is required in SEFOS.

Note - 

If SEFOS has an IP address on a L3 VLAN interface in the same subnet, you might see

ICMP error messages.

Late-Breaking Information

23

Summary of Contents for ES1-24

Page 1: ...Oracle Switch ES1 24 Product Notes Part No E39113 08 November 2016...

Page 2: ......

Page 3: ...ous applications including applications that may create a risk of personal injury If you use this software or hardware in dangerous applications then you shall be responsible to take all appropriate f...

Page 4: ...ons risque notamment dans des applications pouvant causer des dommages corporels Si vous utilisez ce logiciel ou mat riel dans le cadre d applications dangereuses il est de votre responsabilit de pren...

Page 5: ...11 Uplink Port Trailing 12 VRRPv3 12 Oracle ILOM 3 0 Updates 12 Upgrading the Switch Firmware 12 Back Up the Current Configuration Before Upgrading 12 Download the Switch Firmware Package 14 Install...

Page 6: ...Related Error 16922931 30 Loss of Access to Management Node Oracle ILOM When Starting or Resetting the System 16893765 30 CPU Hang on Power Up 16822073 30 slb_lla Long Time to Report Correct Status W...

Page 7: ...ce providers Required knowledge Advanced experience troubleshooting and replacing hardware Product Documentation Library Documentation and resources for this product and related products are available...

Page 8: ...8 Oracle Switch ES1 24 Product Notes November 2016...

Page 9: ...Documentation Reading Order All of the switch product documentation and related documentation can be found at http www oracle com goto es1 24 docs Read the documentation in this order Step Document T...

Page 10: ...3 on page 12 Oracle ILOM 3 0 Updates on page 12 Logical Link Aggregation Logical Link Aggregation LLA is a Layer 2 feature providing the aggregation of links from a server connected to two physical sw...

Page 11: ...task group Refer to the Sun Ethernet Fabric Operating System IEEE DCBX Administration Guide for more information In Band Management In band configuration mode on the switch enables access to the swit...

Page 12: ...xtends capability to IPv6 in addition to IPv4 Version 3 supports subsecond operation VRRPv3 also supports accept mode configuration For more details refer to the VRRPv3 Administration Guide Oracle ILO...

Page 13: ...ions are automatically preserved There is no need to explicitly restore the configuration 1 Configure the default IP address a Enter Global Configuration mode SEFOS configure terminal b Configure the...

Page 14: ...nfig tftp 12 0 0 100 switch conf 7 Download the switch firmware package See Download the Switch Firmware Package on page 14 Download the Switch Firmware Package After backing up your current configura...

Page 15: ...ack Up the Current Configuration Before Upgrading on page 12 1 Ensure that you have a network configuration in place on the switch For more information refer to the Oracle Switch ES1 24 Installation G...

Page 16: ...File System image to partition 1 Checking compressed kernel image Starting kernel upgrade Upgrading image to partition 1 Syncing configuration files Checking FPGA image Starting FPGA upgrade This pro...

Page 17: ...SEFOS show system information Hardware Version 2 5 8_00209384 Firmware Version ES1 24 1 3 1 15 Switch Name Oracle ES1 24 System Contact System Location Logging Option Console Logging Login Authentica...

Page 18: ...e link partner The link partner must be configured in 1 Gbps Forced FDX mode 1 Obtain the SEFOS prompt 2 Configure the speed to 1 Gbps For example to configure ports 21 and 22 SEFOS config terminal SE...

Page 19: ...n SEFOS config if exit SEFOS config interface extreme ethernet 0 4 SEFOS config if shutdown SEFOS config if speed 100 SEFOS config if no shutdown SEFOS config if end SEFOS write startup config Note Th...

Page 20: ...ltering Utility Criteria Default Port Protected Status Disabled 3 Reconfigure the port For example to reconfigure the 10 GbE port Ex0 3 as a tagged port in vlan 3 and permit only tagged frames SEFOS c...

Page 21: ...tagged port using the preferred method a Type these commands For example add 10 GbE port Ex0 3 to vlan 3 as untagged SEFOS configure terminal SEFOS config interface extreme ethernet 0 3 SEFOS config i...

Page 22: ...SEFOS config vlan 4 SEFOS config vlan ports extreme ethernet 0 4 untagged extreme ethernet 0 4 SEFOS config vlan exit SEFOS config interface extreme ethernet 0 4 SEFOS config if switchport pvid 4 SEF...

Page 23: ...Configuring In Band Management on page 23 Configure In Band Management on page 24 Requirements for Configuring In Band Management These requirements must be met to configure in band management In band...

Page 24: ...s reserved Warning The system appears to be in manufacturing test mode Contact Service immediately Warning password is set to factory default 2 Configure the in band management settings cd SP inband_n...

Page 25: ...SEFOS configurations Include the SEFOS Configuration in Backups on page 25 Restore the Configuration on page 26 Include the SEFOS Configuration in Backups By default only the Oracle ILOM configuratio...

Page 26: ...ing the backup or restore operation Because of CR 6934622 the SNMP engine ID even when previously set is not visible after a reset of the system and the administrator must record and set the ID explic...

Page 27: ...ID combinations where a Admin u User Management o Operator c Console r Reset and Host Control and s Service fs_privilege 1 15 1 Specifies the fs_privilege that enables TACACS authenticated users to ac...

Page 28: ...using TACACS 1 Log in to the Oracle ILOM CLI 2 Navigate to the tacacs directory cd SP clients tacacs 3 Use the set command to configure the TACACS properties set SP clients tacacs state enabled addres...

Page 29: ...0 CPU Hang on Power Up 16822073 on page 30 slb_lla Long Time to Report Correct Status When the Link Is Down or Up 16424341 on page 31 SSL V3 0 POODLE DISABLE SSL V3 19842504 Workaround Disable SSLv3 f...

Page 30: ...ink up after the host is shut down This issue results in loss of access to the node Workaround Explicitly set the speed to 100 Mbps on the switch port where the X4170 M2 ZFSSA controller is connected...

Page 31: ...brought back up on both SLB active and SLB standby switches the SLB status on an SLB standby switch does not get updated until the ARP timeout happens Workaround There is no workaround Check for the...

Page 32: ...32 Oracle Switch ES1 24 Product Notes November 2016...

Reviews: